Brigade Granada Logo
  • Home
  • Location
  • Master Plan
  • Floor Plan
  • Price
  • Amenities
  • Gallery
  • Specifications
  • Contact
  • Brochure

Specifications

  1. Home
  2. Specifications

Brigade Granada Specifications


Brigade Granada specifications include an RCC frame with shear-wall technology, 8-foot teak wood main doors, wooden flush internal doors, UPVC windows, vitrified tile flooring, laminated master-bedroom flooring and anti-skid balcony tiles. Kitchens are planned with counters, tiled dado, utility space, RO and appliance points, while bathrooms include ceramic tiles, sanitaryware, chrome-plated fittings, geyser points and exhaust provisions.

The tower specifications include high-speed passenger and service lifts, PVC-insulated wiring, modular switches, CCTV, intercom, video door phones, fire detectors, DG backup for essential services, basement parking and EV-charging facilities. Common areas use granite, vitrified tiles and Kota stone based on the space, while project utilities include rainwater harvesting, water treatment and waste-management systems.

Brigade Granada Specifications

Brigade Granada Specifications Overview

Category Specification
Structure RCC frame with shear-wall technology
Main Door 8-foot teak wood entrance door
Internal Doors Wooden flush doors
Windows UPVC windows and sliding shutters
Living and Dining Vitrified tile flooring
Master Bedroom Laminated flooring
Other Bedrooms Vitrified tile flooring
Kitchen Modular-ready setup, utility space, RO and appliance points
Bathrooms Ceramic tiles, CP fittings, geyser and exhaust points
Balconies Anti-skid ceramic tiles
Electrical PVC-insulated wiring and modular switches
Lifts High-speed passenger lifts and service lifts
Security CCTV, intercom, video door phones and fire alarms
Power Backup DG backup for essential common services
Parking Basement parking, EV charging and car-washing bay

Utilities Rainwater harvesting, water treatment and waste disposal

Detailed Brigade Granada Specifications List August 2026 pre Launch Update:

Structure

  • RCC frames with shear wall technology
  • Cement blocks will be added in some areas
  • The structural system is planned for the 55-floor residential towers
  • Shear walls support high-rise stability and load distribution
  • Cement blocks are used in selected non-load-bearing areas

Flooring

  • Bedrooms, kitchen, dining room, entrance, living room, hallways and utility areas have vitrified tiles
  • Laminated flooring is given in the master bedroom
  • Vitrified tiles are provided in other bedrooms
  • Bathrooms have ceramic floor and wall tiles
  • Balconies use anti-skid ceramic tiles
  • The ground-floor reception area has granite flooring
  • Upper-floor lobbies use vitrified tiles
  • Service lobbies and staircases use Kota stone

Main and Internal Doors

  • All bedrooms will have wood flush doors
  • The main entry door is made of teak wood
  • The main entrance door is planned at 8 feet in height
  • Internal doors include frames, shutters, handles and locking hardware
  • Bathroom and utility doors use finishes suited to wet areas

Windows and External Doors

  • UPVC windows are provided for all units
  • UPVC doors and shutters are provided for apartments
  • Aluminium windows and doors are added in selected areas
  • Sliding UPVC doors connect selected rooms with balconies
  • Large glazed openings support airflow and natural light
  • Utility and service areas may use aluminium frames

Living and Dining

  • Enough light and plug points are provided
  • Tall glass windows are added for airflow and sunlight
  • Internet, TV and telephone points are added
  • Vitrified tile flooring is used in the living and dining areas
  • Balcony access is provided in selected apartment layouts
  • Socket points support television, internet and daily appliances

Bedrooms

  • All bedrooms will have enough electrical points
  • All bedrooms will have a TV point
  • Laminated flooring is given in the master bedroom
  • Vitrified tiles are provided in other bedrooms
  • Internet points are provided in selected rooms
  • Light, fan and socket points are planned based on the apartment layout

Kitchen and Utility

  • The kitchen counters are designed with enough space for a modular kitchen setup
  • A ceramic tile strip is added above the kitchen counter
  • The utility area has adequate space for a sink
  • Plug points are available for dishwashers, grinders and washing machines
  • RO points are added in the kitchen
  • Multiple power points are provided for modern appliances
  • Dedicated points are planned for a refrigerator, microwave and mixer
  • The utility area includes water and drainage connections
  • The kitchen is modular-ready with counter, dado and service points
  • RO, dishwasher and washing-machine points are provisions and do not mean the appliances themselves are supplied

Bathrooms and Toilets

  • All toilets will have geyser provisions
  • Ceramic tiles are provided in all bathrooms
  • Exhaust fan provisions are added
  • Towel rods and soap stands are added
  • Chrome-plated fittings are provided in all toilets
  • PVC-coated false ceilings are added in selected bathrooms
  • The master bathroom includes a shower panel
  • A washbasin is provided in the master toilet
  • Pedestal basins are provided in other toilets
  • Bathrooms include sanitaryware, CP fittings and shower areas
  • Water and drainage lines are planned for easy maintenance
  • Geyser and exhaust-fan points are provisions, while sanitaryware and CP fittings are included in the current specification schedule

Electrical

  • All wirings are done in PVC-insulated wires
  • Modular switches are added
  • All bedrooms will have a TV point
  • Internet points are provided in selected rooms
  • Light, fan and socket points are planned based on the apartment layout
  • Dedicated electrical points are planned for major kitchen appliances, TV, internet, lighting and fans

Lobby and Common Areas

  • Basement and upper lobbies have vitrified tiles
  • A ground-floor lobby is provided in every tower
  • Texture paint is added to lobby walls
  • Service lobbies and staircases use Kota stone
  • Common-area ceilings are painted with distemper
  • Granite is added to the reception area
  • Lift entrances have granite cladding

Lifts

  • High-speed lifts of suitable size are added on all floors
  • Service lifts are provided for carrying heavy materials
  • Passenger lifts connect parking, lobby and residential floors
  • Service lifts support furniture, deliveries and maintenance work
  • Essential lift operations are connected to backup power

Security and Fire Safety

  • Gas leak detectors and fire detectors are added
  • 24/7 security is provided with an intercom facility
  • CCTV cameras are installed in common areas
  • Video door phones are provided
  • Security alarms and restricted entry are included
  • Visitor movement is controlled at the project and tower entrances
  • Fire alarms and emergency systems are planned for the high-rise towers
  • Parking, lobbies and key common zones receive CCTV coverage

Painting and Balcony Finish

  • External walls are painted with distemper paint
  • Internal walls use emulsion paint
  • Railings are painted with enamel paint
  • Balconies have anti-skid ceramic tiles
  • Lobby walls use textured paint
  • Balconies include drainage points and safety railings
  • External finishes follow the approved tower elevation

DG Power Backup

  • Buyers will get apartment power backup at an extra cost
  • Common areas and the clubhouse have 24/7 power supply
  • Backup power supports lifts, pumps, lighting and security systems
  • Apartment backup capacity depends on the selected electrical load

Parking and Utilities

  • Parking is provided for cars and two-wheelers
  • A car-washing bay is included
  • EV-charging features are provided
  • Water-treatment methods are included
  • Waste-disposal systems are provided
  • Basement parking connects with residential lift lobbies
  • Rainwater-harvesting systems support water management
  • Dry and wet waste can be collected through separate systems

Brigade Granada Specifications by Area

Area Main Specification
Living & Dining Vitrified tiles, TV, internet and electrical points
Master Bedroom Laminated flooring, TV and electrical points
Other Bedrooms Vitrified tiles, TV and electrical points
Kitchen Counter, tiled dado, utility, RO and appliance points
Bathrooms Ceramic tiles, sanitaryware and CP fittings
Balcony Anti-skid tiles, drainage and safety railing
Ground-Floor Lobby Granite flooring
Upper Lobbies Vitrified tiles
Service Lobby & Stairs Kota stone
Basement Parking Car parking, two-wheeler parking and EV charging

Features Provided and Provision-Only Items

Brigade Granada specifications include supplied materials as well as service provisions. A provision gives the required point or connection, while the appliance may need to be purchased separately.

Feature Status
Main and Internal Doors Provided
UPVC Windows and Sliding Doors Provided
Apartment Flooring Provided
Bathroom Sanitaryware and CP Fittings Provided
Kitchen Counter and Tiled Dado Provided
RO Connection Provision
Dishwasher Point Provision
Washing-Machine Point Provision
Geyser Point Provision
Exhaust-Fan Point Provision
TV and Internet Points Provision
EV Charging Project-level facility

Apartment, Tower and Project-Level Specifications

Level Specification
Apartment Doors, windows, flooring, kitchen counter, bathroom fittings, wiring and switches
Apartment Provisions RO, dishwasher, washing machine, geyser, exhaust fan, TV and internet points
Tower Passenger lifts, service lifts, CCTV, intercom, fire systems and common DG backup
Project Basement parking, EV charging, rainwater harvesting, water treatment and waste management

Specifications Designed for 55-Floor Towers

  • RCC frames and shear walls support the high-rise structure
  • High-speed passenger lifts serve the residential floors
  • Separate service lifts support furniture, deliveries and maintenance
  • DG backup supports lifts, pumps, common lighting and security systems
  • CCTV, fire detectors, alarms, intercom and controlled access support tower safety
  • Basement parking connects directly with residential lift lobbies

What Buyers Should Verify in the Final Specification Sheet

  • Exact flooring tile size and brand
  • Sanitaryware brand
  • CP fitting brand
  • Modular switch and wiring brands
  • Apartment electrical load
  • DG backup capacity
  • Number and capacity of lifts in each tower
  • Exact EV-charging allocation
  • Kitchen cabinet scope
  • Bathroom false-ceiling and shower-panel scope

Brigade Granada Specifications PDF

The Brigade Granada Specifications PDF should show the final material schedule for the structure, flooring, doors, windows, kitchen, bathrooms, electrical work, lifts, parking, power backup and common areas. Buyers should check the latest dated PDF for tile sizes, fitting brands, electrical load, lift capacity and the exact list of supplied and provision-only items.

FAQs


1. What structure is used at Brigade Granada?

Brigade Granada is planned to use an RCC frame with shear-wall technology for the residential towers, which are planned up to around 55 floors.

2. What flooring is provided in the apartments?

Vitrified tiles are proposed for the living, dining, kitchen and other bedroom areas, with laminated flooring proposed for the master bedroom and anti-skid ceramic tiles for balconies.

3. Is a modular kitchen provided?

A modular kitchen provision is planned, including a counter, tiled dado, utility space, RO point and appliance connections. The current specification does not confirm fitted cabinets or kitchen appliances as supplied items.

4. What doors and windows are used?

Homes are proposed to have 8-foot teak wood main doors, wooden flush internal doors, and UPVC windows and sliding shutters.

5. What bathroom fittings are provided?

Bathrooms are proposed to include ceramic tiles, sanitaryware, chrome-plated fittings, washbasins, shower areas, geyser points and exhaust provisions.

6. Is power backup available?

In-home DG backup is planned as an optional, chargeable add-on. Lifts, pumps, common lighting and security systems are separately planned to receive common-area backup power as standard.

7. Are lifts provided in all residential towers?

Yes. Towers are planned to include high-speed passenger lifts and separate service lifts.

8. Does Brigade Granada provide EV charging?

Yes. EV-charging facilities are planned as part of the basement parking layout.

9. Which specification items are only provisions?

RO, dishwasher, washing machine, geyser, exhaust fan, TV and internet points are provisions only. Doors, windows, flooring, sanitaryware, CP fittings, the kitchen counter and tiled dado are listed as provided items.

10. What flooring is used in the common areas?

The ground-floor reception is planned with granite, upper-floor lobbies with vitrified tiles, and service lobbies and staircases with Kota stone.

11. Are fitting and tile brands confirmed?

The current specification gives material types but does not confirm every tile, sanitaryware, CP fitting or switch brand. Buyers should verify these details in the final material schedule.

12. Where can buyers check the complete specifications?

Full details are available in the Brigade Granada specifications PDF and the material schedule issued for the project.

Brigade Granada Blog


Brigade Granada Project Status
Featured Image of Brigade Project Carpet Area vs Built-up Area Comparison
Featured Image of Smart Home Brigade apartment projects Whitefield
Featured Image of Are there any dedicated service elevators and stretcher lifts in Brigade Granada high-rises?
Featured Image of Brigade Granada structural earthquake resistance and seismic zone compliance
Featured Image of Broadband readiness and fiber optic internet connectivity in Brigade Granada
Featured Image of Fire safety compliance and emergency evacuation plans for Brigade Granada
Featured Image of Mivan construction technology and its benefits in Brigade group projects
Featured Image of Power backup capacity allocation for 3 BHK and 4 BHK at Brigade Granada
Featured Image of Soundproofing and acoustic insulation quality in Brigade Granada apartments
Featured Image of Types of flooring, wall finishes, and premium bath fittings in Brigade Granada

Disclaimer : The content is for information purposes only and does not constitute an offer to avail of any service. Prices mentioned are subject to change without notice and properties mentioned are subject to availability. Images for representation purposes only. This is the official website of authorized marketing partner. We may share data with RERA registered brokers/companies for further processing. We may also send updates to the mobile number/email id registered with us.

As an authorized marketing partner, we provide verified project updates and insights. By submitting your details, you express interest and consent to receive communication via call, SMS, or email. To provide seamless service, your information may be shared with our RERA-registered associates for expert assistance.

© 2026 All rights reserved

Privacy Policy, Disclaimer

Enquire Now
Title